Road, footpath and council asset dilapidation surveys

An infrastructure dilapidation survey records the condition of roads, footpaths, kerbs, drains and other public assets before works start and again when they finish. Every defect is photographed and located, so damage that was already there isn't charged to your project.

Defects located by chainageDated photo recordBefore and after

// Fixed price before we start

Quote your asset survey

Reply within 1–2 business hours. No obligation.

Starting from $390 + GST. Prefer to talk? 07 2150 0579

Signed by structural engineersEngineers Australia · RPEQ
Fixed quote in 1–2 business hoursMon–Fri: 8:00am – 5:00pm
From $390 + GSTPrice fixed before we start
Engineering onlyWe never quote for repairs

// Overview

What is an infrastructure dilapidation survey?

The short answer

An infrastructure dilapidation survey, also called a road dilapidation report, road condition survey or council dilapidation report, is a dated, engineer-signed record of the public assets around a works site. Each existing defect in the road, kerb, footpath, crossovers and drains is photographed and located before works start, then checked again when they finish.

Private dilapidation reports protect you against claims from neighbours. A road and council asset survey does the same job for the street: it shows what the footpath, kerb and road looked like before your trucks, plant and deliveries arrived, so you aren't charged for cracks that were already there.

Who orders it
Developers, civil and building contractors, councils and asset owners
When
Before works start, and again when they finish
What's recorded
Roads, kerbs, footpaths, crossovers, drains, nature strips and street trees
How defects are located
By chainage along the route, side of road and nearest address
Signed by
A structural engineer (Engineers Australia · RPEQ)
Quote
Fixed price within 1–2 business hours, priced on length and assets
Engineer in a hard hat and hi-vis vest walking the edge of a suburban road with a measuring wheel, photographing the kerbCH 0+000 · BASELINE

Key takeaways

  • Survey the street before the first truck arrives, or the baseline is lost.
  • Chainage lets anyone find the same defect again.
  • A dated record protects bonds and deposits held against damage.
  • The after survey uses the same route, so changes are clear.

// What we record

Which roads and council assets do we record?

Everything in the road reserve that your works could damage, recorded so each defect can be found and re-checked in the after survey.

Road pavement

Cracking, potholes, patches, edge breaks and depressions along the frontage and agreed haul routes.

Kerb and channel

Cracked, displaced or broken sections of kerb and channel, including laybacks at crossovers.

Footpaths and crossovers

Cracked, lifted or settled slabs, uneven joints and damaged vehicle crossovers.

Drains and pits

Pit lids, grates and visible surrounds, with any existing damage noted.

Nature strips and street trees

Turf, street trees and tree guards near access points, where vehicles and stockpiles do the most harm.

Street furniture and signs

Signs, poles, bollards and similar fixtures within the survey extent.

Need the neighbouring buildings recorded too? Add them as a pre-construction dilapidation report in the same booking, with one fixed quote for the lot.

// When you need one

When is a road or council asset survey needed?

Whenever your works could damage public assets and someone could later ask who's responsible. Common triggers:

  • A consent condition asking for public assets at the frontage to be recorded before works start
  • A council asset protection permit or bond held against damage to footpaths, kerbs and crossovers
  • Haul routes where trucks and heavy plant will use local streets for months
  • Civil and infrastructure works, such as pipelines, drainage or road upgrades beside private property
  • Subdivisions and estate works that tie into existing roads and services
  • Large building projects with cranes, deliveries and frontage works

Asset protection permits

Many Victorian councils require an asset protection permit before building work starts, often with a fee and a bond. Councils elsewhere may use different names, such as a damage deposit. Check your council's current requirements; our guide explains how asset protection permits work.

Cracked concrete footpath and kerb outside a construction site hoarding with orange barriers
Figure 1Existing cracks in a footpath and kerb outside a site. Recorded with chainage and a photo before works start, they stay on file as existing defects rather than new damage.

The first truck ends the baseline

Once deliveries, demolition or excavation start, nobody can prove what the footpath and kerb looked like before. Book the survey as soon as your start date is set.

// Method

How are defects located and recorded?

By chainage. Chainage is the measured distance along a route from a fixed start point, so a defect logged at CH 0+145 sits 145 metres from the start. Each defect is also given the side of the road, the asset it's in and the nearest address, which makes it easy to find again months later.

  • A fixed start point, described and photographed, so the after survey starts in the same place
  • Measured chainage to each defect, with its side of the road
  • Dated photographs of every defect, plus overview photos along the route
  • A defect log giving each defect's reference, asset, description and approximate size
  • An engineer's signature, with the survey extent and any areas that couldn't be accessed

If your contract or council asks for a particular format, such as video of the route, send the wording with your quote request so the scope matches it.

Defect logExample extract · illustrative data
Example
RefChainageAssetDefectWidthLength
D-01CH 0+012 LFootpathTransverse crack2 mm1.2 m
D-02CH 0+034 LKerb and channelCracked section4 mm0.6 m
D-03CH 0+058 LCrossoverCorner breakn/a0.3 m
D-04CH 0+097 RRoad pavementLongitudinal crack3 mm4.5 m
D-05CH 0+145 LDrainage pitChipped lid edgen/a0.2 m

Every entry links to a numbered photo, so the after survey can check the same defect from the same spot.

// How it works

How does a road and council asset survey work?

Six steps from the survey extent to the final comparison. The first four happen before your works touch the street.

  1. As soon as works are planned

    Define the survey extent

    Agree the streets, frontages and haul routes to record from your consent conditions, permit or contract, and mark the start point for chainage.

  2. Within 1–2 business hours

    Get one fixed quote

    Receive a fixed price for the before survey, the after survey or both, with survey dates set around your program.

  3. Before works start

    Survey before works start

    Walk the route, photograph each asset and log every existing defect with its chainage, side, size and photo reference.

  4. Before works start

    Issue the signed baseline

    Receive an engineer-signed report ready to lodge with the council, asset owner or principal contractor.

  5. When works finish

    Survey again when works finish

    Repeat the survey along the same route and compare each asset with the baseline, logging any new or changed defects.

  6. At handover or bond release

    Use the comparison

    Share the before-and-after comparison when bonds, deposits or damage claims are settled.

Before and after, side by side

Before surveyAfter survey
WhenBefore works startWhen works finish
PurposeRecord existing defectsFind new or changed defects
OutputDefect log, photos, chainageComparison with the baseline
  • One fixed quote for the before and after surveys
  • The same route, start point and chainage both times
  • An engineer's signature on every report
  • Neighbouring buildings can be added to the same booking

// Who it's for

Who uses road and council asset surveys?

Anyone who could be asked to pay for damage to the street, or who needs to prove that damage was already there.

Developers and builders

Protect bonds and deposits, and meet consent or permit conditions about public assets at the frontage.

Civil contractors

Record roads, kerbs and drains along pipelines, upgrades and haul routes before plant moves in.

Councils and asset owners

An independent, engineer-signed record of asset condition before and after third-party works.

Owners and owner-builders

A frontage record for a single house build, when your council asks for one or holds a bond.

Do

  • Survey before deliveries, demolition or excavation start
  • Include haul routes your trucks will use
  • Send the condition or permit wording with your quote request
  • Book the after survey as soon as works finish

Don't

  • Rely on a few phone photos without locations
  • Forget nature strips, street trees and pit lids
  • Let the frontage be reinstated before the after survey
  • Assume the council's records will cover you

See how pricing works on our dilapidation report cost page, or read when a dilapidation report is required.

// Questions

Road and council asset survey FAQs

Still unsure? Call 07 2150 0579 and an engineer will talk it through.

What is an infrastructure dilapidation report?
It's a dated, engineer-signed record of public assets near a works site, such as roads, footpaths, kerbs, drains and nature strips. It's also called a road dilapidation report, road condition survey or council dilapidation report.
Which assets are included?
Usually the road pavement, kerb and channel, footpaths, vehicle crossovers, drainage pits and grates, nature strips, street trees and street furniture along the frontage and any agreed haul route. The scope follows your consent conditions, permit or contract.
Why do councils and contracts ask for one?
Councils and asset owners often hold a bond or deposit against damage to public assets, or require a record before works start. A dated survey shows which defects were already there, so they aren't charged to your project.
Is it the same as an asset protection permit?
No. An asset protection permit is a council approval, often with a fee and bond. The survey is the evidence of asset condition before and after the works. Read our guide to asset protection permits in Victoria.
How are defects located?
By chainage, the measured distance along the route from a fixed start point, plus the side of the road and the nearest address. That lets anyone find the same defect again in the after survey.
Can you include haul routes used by heavy vehicles?
Yes. Access roads and haul routes can be added to the survey extent, with the same chainage referencing, so damage from trucks and plant can be separated from defects that were already there.
Do you repair damaged footpaths or roads?
No. We are engineering only: we inspect, record and report. Repairs are arranged by the contractor, council or asset owner.
How much does a road or council asset survey cost?
It depends on the length of road or frontage, the number of assets and whether you need the before survey, the after survey or both. Send the address, extent and program and you'll get a fixed quote within 1–2 business hours.

// Before work starts

Get your dilapidation report booked before the first excavator arrives.

Tell us the address and when works start. You'll have a fixed quote within 1–2 business hours, and an engineer-signed report you can rely on if anything changes.