Pre-construction dilapidation reports for builders

A pre-construction dilapidation report records the condition of the properties next to your site before demolition, excavation or piling begins. It protects you against unfounded damage claims and is often a condition of development consent. A structural engineer inspects each property and signs the report.

DA condition readyMulti-property quotesCopies for each owner

// Fixed price before we start

Quote your project

Reply within 1–2 business hours. No obligation.

Starting from $390 + GST. Prefer to talk? 07 2150 0579

Signed by structural engineersEngineers Australia · RPEQ
Fixed quote in 1–2 business hoursMon–Fri: 8:00am – 5:00pm
From $390 + GSTPrice fixed before we start
Engineering onlyWe never quote for repairs

// Overview

What is a pre-construction dilapidation report?

The short answer

A pre-construction dilapidation report, also called a pre-construction survey, pre-construction inspection or pre con survey, is a dated, engineer-signed record of each property next to your site, made before demolition, excavation or piling starts. The builder or developer orders it, often to satisfy a development consent condition, and it becomes the baseline any later damage claim is compared against.

It doesn't judge whether a neighbour's house is in good or bad condition. It records what's there, with located photos and measured cracks, so nobody has to rely on memory if a crack is reported halfway through your basement dig. Read our guide to what a dilapidation report is for the full background.

Who orders it
The builder, developer or owner-builder doing the works
When
Before demolition, excavation, piling or heavy plant on site
What's recorded
Each neighbouring property, inside and out, plus public assets if required
Signed by
A structural engineer (Engineers Australia · RPEQ)
Time on site
One to three hours for a typical house
Price
From $390 + GST for a typical house, fixed before we start
Excavator digging a basement beside the side wall of a neighbouring housePRE-WORKS · ADJOINING

Key takeaways

  • Book once your start date is set. The baseline must come before works.
  • Send your consent condition wording so the scope matches it exactly.
  • Each owner gets a separate report of their own property.
  • It protects you against claims for damage that was already there.

// What we record

What's included in a pre-construction dilapidation report?

A site dilapidation report covers everything a damage claim could later point to, recorded in enough detail that the same defect can be found and re-measured months later.

Located photographs

Every external elevation and each accessible room, numbered and located on a plan so they can be retaken from the same spot.

Measured crack register

Each crack's reference, location, width, length and orientation, linked to its photo.

Other defects

Water stains, sticking doors, uneven floors, cracked tiles, separated joints and earlier repairs.

Boundary and site elements

Boundary and retaining walls, fences, paving, driveways, pools and garden structures near your works.

Public assets

Footpaths, kerbs, gutters, crossovers and road surfaces at the frontage, so you aren't blamed for damage that was already there. Longer routes suit a road and council asset survey.

Engineer's signature

Signed by a structural engineer, with a clear statement of what was and wasn't inspected.

See how these sections look in our sample dilapidation report, or read why an engineer's report carries more weight than a photo-only record.

// When you need one

When do you need a pre-construction dilapidation report?

Before any work that could plausibly affect a neighbouring property. Once demolition or excavation starts, the baseline is gone, so book it before the first machine arrives:

  • Demolition of an existing building close to a boundary, with a pre-demolition survey of each neighbour
  • Excavation for basements, footings or retaining walls
  • A swimming pool dug close to a neighbour's footings, fence or retaining wall
  • Piling or rock breaking that sends vibration into nearby structures
  • Heavy plant, cranes or trucks working next to boundary walls and driveways
  • Dewatering or drainage changes that can affect neighbouring footings
  • Work on a shared wall in a terrace, semi or townhouse

Check your consent conditions

Councils commonly include dilapidation conditions in development consents for excavation, demolition and piling near boundaries, so check the conditions attached to your development application (DA) approval or building permit. In NSW, section 177 of the Conveyancing Act 1919 provides a right of support for land. In Victoria, Part 7 of the Building Act 1993 covers protection of adjoining property, and where protection works are needed, a dated record of the adjoining property is especially valuable. Elsewhere, check your development approval or building permit conditions.

Our guide explains when a dilapidation report is required in more detail.

Which neighbouring properties should be included?

The properties your consent names, every property sharing a boundary with the works, and any building whose footings sit within the excavation's zone of influence.

Is the neighbour's footing within the zone of influence?

Zone of influence of an excavation next to a neighbouring house Cross-section: a house on the left with a footing close to the boundary, and an excavation of depth H on the right supported by a shoring wall. A line drawn up from the base of the excavation at 45 degrees reaches the ground surface on the neighbour's side, and the neighbour's footing sits inside the shaded zone of influence. Neighbour's house Boundary Your site Excavation H Zone of influence 45° Shoring wall Neighbour's footing
Figure 1A simplified section. A common rule of thumb draws a line up from the base of an excavation at about 45°, flatter in soft or wet ground. Footings above that line, like the neighbour's here, are within the zone of influence and more likely to move if the excavation isn't properly supported. An engineer assesses the actual zone for each site.Illustrative diagram, not to a specific site. Prepared by Omega Dilapidation Reports.

// Piling and vibration

Does piling or rock breaking need a dilapidation report?

Yes, it's one of the strongest reasons to have one. Vibration from piling, rock breaking and compaction travels through the ground into neighbouring buildings, and a neighbour who feels it is far more likely to go looking for cracks. A baseline recorded before the rig arrives lets you answer that concern with evidence.

Engineers in Australia commonly reference the German standard DIN 4150-3 when judging the risk of building damage from vibration. It gives guideline values of peak particle velocity (PPV) at the foundation, and they're lowest for sensitive and heritage buildings. BS 7385-2 is also referenced. Both are guidelines engineers use, not legal limits.

Auger piling rig drilling on a muddy site beside a two-storey brick house behind orange safety fencing
Figure 2A piling rig working metres from an older brick house. Recording its walls, ceilings and cracks before piling starts is what lets you separate new damage from old.

DIN 4150-3 guideline vibration values by building type

DIN 4150-3 guideline vibration values by building typeCommercial / industrial, Dwellings, Sensitive / heritage0102030405001050100Frequency (Hz)PPV (mm/s)
  • Commercial / industrial
  • Dwellings
  • Sensitive / heritage
View the data
Frequency (Hz)Commercial / industrialDwellingsSensitive / heritage
12053
102053
5040158
100502010
Figure 3Guideline peak particle velocity (PPV) at the foundation for short-term vibration. Engineers use these values to judge the risk of damage; they are guidelines, not legal limits. Sensitive and heritage buildings have the lowest values, which is why they're recorded with particular care before vibration-heavy work.Source: DIN 4150-3, guideline values for short-term vibration. Values between the stated frequencies follow the standard's ranges.

Higher-risk job?

Add crack monitoring to selected cracks in the nearest buildings, with readings timed around piling and excavation, so any movement is caught early.

// Builders and developers

How does the pre-construction process work?

Multi-property projects are handled in one booking. Send your consent condition and site plan, and we'll identify the properties, quote them together and schedule the inspections so your start date doesn't move.

  1. As soon as you have consent

    Send the condition and site plan

    We read the dilapidation condition and identify which properties and public assets need recording.

  2. Within 1–2 business hours

    Get one fixed quote

    A single price covering every property and public asset, with inspection dates confirmed.

  3. Before the inspections

    Notify the neighbours

    A short, plain letter explaining that the report protects both parties. We can provide one with your booking.

  4. Before works start

    Inspect each property

    Elevations and accessible rooms photographed, existing cracks measured and logged.

  5. Before works start

    Issue signed reports per owner

    A separate report for each owner, ready to hand over. Copies to your certifier or council if your consent requires.

  6. After works finish

    Compare after the works

    A post-construction report re-inspects each property against its baseline.

What builders get

  • One fixed quote covering every property and public asset
  • The same report format and crack register for each property
  • Separate reports per owner, ready to hand over
  • An engineer's signature on every report
  • Optional post-construction comparison and crack monitoring

Attach your consent conditions and site plan on the quote form for the most accurate price. See what affects the cost.

// Access

What if a neighbour refuses access?

Owners don't have to let anyone in. When access is refused, we record everything visible from your site, the street and public land, and document the request and refusal in the report, with dates. That still gives you a dated record of the property's external condition.

Most refusals come from worry about why the inspection is needed. A short, plain letter explaining that the report protects both parties usually helps. Read can a neighbour refuse a dilapidation report?

// After the works

Do you need a post-construction report too?

On higher-risk jobs, yes. When your works finish, a post-construction report re-inspects each property against the original record. If a claim comes in, an engineer can say whether the change is new and whether your works are a likely cause.

If a neighbour does report damage, our guide on construction damage next door explains how the comparison is used.

Do

  • Book as soon as your start date is set
  • Send the exact consent condition wording
  • Include public assets if your consent asks for them
  • Give each owner their own report

Don't

  • Start demolition before every report is done
  • Rely on a photo-only record for deep excavation
  • Forget fences, retaining walls and paving on the boundary
  • Skip the post-construction comparison on higher-risk jobs

// Questions

Pre-construction dilapidation report FAQs

Still unsure? Call 07 2150 0579 and an engineer will talk it through.

Is a dilapidation report a development consent condition?
Often, especially where works involve demolition, excavation close to a boundary or piling. The condition usually says which properties must be recorded, when the report is due and who receives a copy. Send us the wording and we'll quote exactly what it asks for.
Which properties need to be included?
At minimum, the properties your consent conditions name. It's sensible to also include every property sharing a boundary with the works, any building within the zone of influence of excavation, and public assets at the frontage such as the footpath, kerb and road.
Do neighbours receive a copy of the report?
Commonly, yes. Many consent conditions require a copy to be given to each owner, and we issue a separate report for each property so owners only receive the record of their own home.
What if a neighbour won't allow access?
We record everything visible from the street, your site and public land, and note in the report that internal access was requested and refused, with dates. That record still protects you. Read can a neighbour refuse a dilapidation report?
How soon can you inspect?
We confirm an inspection date in your quote, which you'll receive within 1–2 business hours of sending the address and start date. Book as soon as your start date is set, because the inspection must happen before any demolition or excavation.
How much does a pre-construction dilapidation report cost?
Ours start from $390 + GST for a typical house. Multi-property projects get one fixed quote covering every property and public asset, priced on size, inside access and what your consent conditions require. See dilapidation report costs.
Who pays for a pre-construction dilapidation report?
Usually the builder or developer doing the works, because the report protects them and is often their consent condition. Read who pays for a dilapidation report.
Is a pre-construction survey the same as a dilapidation report?
Yes. A pre-construction survey, pre-construction inspection, pre con survey or pre-demolition survey all describe a dilapidation report made before works start. The name changes; the record of each neighbouring property is the same.
Do I need a dilapidation report for a swimming pool?
Not always as a condition, but it's worth having when the pool is dug close to a boundary, because the excavation can take support from a neighbour's footings, fence or retaining wall. Check your development application or building permit conditions first.
Do owner-builders need a dilapidation report?
The same conditions apply to an owner-builder as to a builder. If your development consent or building permit includes a dilapidation condition, the report is needed before works start, and even without one it protects you against claims for damage that was already there.
Do I also need a post-construction report?
On higher-risk jobs, yes. A post-construction report re-inspects each property against its original record when works finish, which is what settles any later claim.

// Before work starts

Get your dilapidation report booked before the first excavator arrives.

Tell us the address and when works start. You'll have a fixed quote within 1–2 business hours, and an engineer-signed report you can rely on if anything changes.

Get a fixed quote Call 07 2150 0579

Starting from $390 + GST · No obligation

Call Get a fixed quote