What is a dilapidation report?

A dilapidation report is a dated record of a property's condition before nearby demolition, excavation or construction. Here's what it includes, how cracks are measured and rated, when you need one and how it's used.

Clear crack width gauge taped beside a crack in a plaster wallCRACK · MEASURED

The short answer

A dilapidation report is a dated record of a property's condition, made before nearby demolition, excavation or construction starts. It combines photographs with written observations and measurements of existing cracks and defects, so that if damage is claimed later, the property's condition can be compared against evidence of how it looked before.

Key takeaways

  • It's a baseline: evidence of condition on a specific date.
  • It must be done before works start, or the baseline is lost.
  • Measured cracks make it far more useful than photos alone.
  • It protects both the party doing the works and the neighbours.

The word "dilapidation" means a state of disrepair. In construction, a dilapidation report doesn't judge whether a building is in good or bad condition. It simply records what's there, so no one has to rely on memory later. That's why it's also called a pre-construction condition survey, a property condition report or simply a dilap report. In commercial leases you may also hear "property dilapidations", meaning disrepair a tenant may have to make good at the end of a lease.

Dilapidation reports: quick facts

What it is
A dated record of a property's condition, with photos and measurements
When
Before demolition, excavation, piling or major works nearby
Who orders it
Usually the builder or developer; neighbours can order their own
Who prepares it
Building inspectors or structural engineers
Time on site
One to three hours for a typical house
Our price
From $390 + GST, fixed before we start

What's included in a dilapidation report

A useful dilapidation report records enough detail that the same defect can be found and re-checked months later. Ours include:

Report details

The property, purpose, who commissioned it, the inspection date and weather, and any areas not accessed.

Located photographs

Each external elevation and accessible room, numbered and located on a plan so they can be retaken from the same spot.

Crack register

Every crack with its location, measured width, length and orientation, linked to a photo.

Other defects

Water stains, sticking doors, uneven floors, separated joints, cracked tiles and earlier repairs.

Site elements

Fences, boundary and retaining walls, paving, driveways and pools near the works.

Public assets

Footpaths, kerbs and crossovers at the frontage, where your consent asks for them.

Every report ends with the engineer's signature and a clear statement of what was and wasn't inspected. See how these sections look in our sample dilapidation report. There's no Australian Standard written specifically for dilapidation reports; read which standards reports reference.

How cracks are recorded and rated

Cracks are the heart of most damage disputes, so they need more than a photo. Each one is given a reference number, located on the plan, and measured for width and length with a crack width gauge. Its direction (vertical, horizontal, diagonal or stepped along mortar joints) is noted, because the pattern helps an engineer read what caused it.

Diagonal hairline crack running from the corner of a window across a plaster wall, with an orange marker beside it
Figure 1A diagonal crack from a window corner is a common pre-existing defect. Recording its width and length now is what lets anyone prove later whether it grew.

Many reports also rate each crack against the damage categories in AS 2870, the Australian Standard for residential slabs and footings. The categories run from 0 (hairline) to 5 (very severe), and give everyone a shared language for how significant a crack is.

  1. Cat 0Negligible< 0.1 mm

    Hairline cracks.

  2. Cat 1Very slight< 1 mm

    Fine cracks which do not need repair.

  3. Cat 2Slight< 5 mm

    Cracks noticeable but easily filled. Doors and windows stick slightly.

  4. Cat 3Moderate5–15 mm

    Cracks can be repaired; some wall may need replacing. Doors and windows stick, service pipes can fracture, weathertightness often impaired.

  5. Cat 4Severe15–25 mm

    Extensive repair: sections of wall broken out and replaced. Frames distort, walls lean or bulge, some loss of bearing in beams.

  6. Cat 5Very severe> 25 mm

    Major repair, partial or complete rebuilding. Beams lose bearing, walls lean badly and need shoring. Danger of instability.

Figure 2Damage categories for walls, with approximate crack widths. Crack width is a guide only: the number, pattern and location of cracks also matter.Source: AS 2870-2011 Residential slabs and footings, Appendix C, Table C1.

Width isn't everything

The standard treats crack width as a guide only. Ten fine cracks in one wall can matter more than one wider crack, and a crack that is still growing matters more than an old, stable one. That's why repeat measurements against a baseline are so valuable.

When you need a dilapidation report

You need one before any work that could plausibly affect a neighbouring property:

  • Demolition of a building near a boundary
  • Excavation for a basement, pool, footings or retaining wall
  • Piling, rock breaking or other high-vibration work
  • Heavy machinery, cranes or trucks operating beside a boundary
  • Structural work on a shared wall in a terrace, semi or townhouse

Excavation is the most common trigger, because removing soil next to a boundary can take support away from a neighbour's footings. The closer and deeper the dig, the more likely the neighbour's house sits within its zone of influence.

Is the neighbour's footing within the zone of influence?

Zone of influence of an excavation next to a neighbouring house Cross-section: a house on the left with a footing close to the boundary, and an excavation of depth H on the right supported by a shoring wall. A line drawn up from the base of the excavation at 45 degrees reaches the ground surface on the neighbour's side, and the neighbour's footing sits inside the shaded zone of influence. Neighbour's house Boundary Your site Excavation H Zone of influence 45° Shoring wall Neighbour's footing
Figure 3A simplified section. A common rule of thumb draws a line up from the base of an excavation at about 45°, flatter in soft or wet ground. Footings above that line, like the neighbour's here, are within the zone of influence and more likely to move if the excavation isn't properly supported. An engineer assesses the actual zone for each site.Illustrative diagram, not to a specific site. Prepared by Omega Dilapidation Reports.

Councils often make dilapidation reports a condition of development consent for these works. Commercial landlords and tenants also use them at the start of a lease and before make-good. Read when a dilapidation report is required.

How the dilapidation process works

From consent condition to final comparison, the process has six steps. Most of the value comes from doing the first four before anyone touches the site.

  1. As soon as you have consent

    Check your consent conditions

    Look for a dilapidation condition. It usually names the properties to record, when the report is due and who gets a copy.

  2. Weeks before works

    Request a fixed quote

    Send the address, works type, start date and the condition wording. We reply with a fixed price within 1–2 business hours.

  3. Before the inspection

    Arrange access with neighbours

    A short letter explaining that the report protects both parties gets most owners to agree to internal access.

  4. Before works start

    Inspect and record

    Every elevation and accessible room is photographed, and existing cracks are measured and logged.

  5. Before works start

    Issue and share the signed report

    Each owner receives the record of their own property. Lodge copies with your certifier or council if required.

  6. After works finish

    Compare with a post-construction report

    Recorded cracks are re-measured and new defects logged, so any change is clear.

Pre-construction vs post-construction reports

Pre-constructionPost-construction
WhenBefore works startAfter works finish (or a high-risk stage)
PurposeRecord the baseline conditionCompare against the baseline
OutputPhotos, crack register, defectsChanges, new defects, opinion on likely cause
Ordered byUsually the builder or developerBuilder, neighbour or insurer

The pair together is what settles disputes: one proves what was there, the other proves what changed. See pre-construction and post-construction reports.

Who prepares a dilapidation report?

Dilapidation reports are prepared by building inspectors and by structural engineers. Both can record condition well. An engineer's report adds measured cracks, an assessment of structural significance and, after the works, an opinion on likely cause, and it's signed by a registered professional engineer. Read engineer vs building inspector.

Independence matters

Choose a provider that doesn't quote for repairs. A report written by someone who might be paid to fix the damage is easier to challenge. We're engineering only: we inspect, record and report, and never carry out building work.

How the report is used if damage appears

If a neighbour reports new cracks during or after the works, the property is re-inspected and compared with the original report. Each recorded crack is re-measured, and new defects are logged. An engineer can then give an opinion on whether the change is new and whether the works are a likely cause.

Without a report, that conversation becomes one person's memory against another's. With one, it's a comparison of evidence. That's the whole point. Read what to do if construction next door damages your house.

Noticed a new crack?

Photograph it with something for scale, note the date, and tell the builder in writing straight away. Don't patch or paint over it until it has been recorded and measured.

Getting a useful dilapidation report

Do

  • Book as soon as your start date is set
  • Ask for measured cracks, not just photos
  • Include inside rooms wherever access allows
  • Give each owner a copy of their own record

Don't

  • Wait until demolition or excavation has started
  • Settle for an external-only record if inside access is possible
  • Forget fences, retaining walls and paving near the works
  • Skip the post-construction comparison on higher-risk jobs

Glossary

Dilapidation report
A dated record of a property's condition before nearby works. Also called a condition survey or dilap report.
Baseline
The condition recorded before works, which later inspections are compared against.
Crack register
A table listing each crack's reference, location, width, length, orientation and photo.
Zone of influence
The area of ground around an excavation that can move if the excavation isn't properly supported.
Post-construction report
A re-inspection after works that compares the property with the original record.
Make-good
A tenant's obligation to return leased premises to an agreed condition at the end of a lease.

Sources and standards referenced

  1. Standards Australia, AS 2870-2011 Residential slabs and footings. Appendix C, Table C1: classification of damage to walls
  2. Standards Australia, AS 4349.0-2007 Inspection of buildings, Part 0: General requirements

// Questions

Frequently asked questions

Still unsure? Call 07 2150 0579 and an engineer will talk it through.

What does dilapidation mean?
Dilapidation means a state of disrepair or decay. In building and construction, a dilapidation report records the existing condition of a property, including any disrepair, so later changes can be identified.
What is the purpose of a dilapidation report?
To create independent, dated evidence of a property's condition before nearby works start. If damage is claimed later, the property can be re-inspected and compared with the report, so everyone can see what's new.
What is included in a dilapidation report?
Located, numbered photos of each elevation and accessible room, a crack register with each crack's location, width, length and orientation, other existing defects, site elements such as fences and retaining walls, public assets where required, and the engineer's signature with the limits of the inspection.
How long is a dilapidation report valid?
It records condition on the inspection date, so it's most useful when done shortly before works start. If works are delayed by months, or the property changes, a fresh inspection gives a more reliable baseline.
Is a dilapidation report the same as a building inspection?
No. A pre-purchase building inspection assesses a property for a buyer. A dilapidation report records condition at a point in time so later changes, usually from nearby works, can be proven.
How long does a dilapidation inspection take?
A typical house takes one to three hours on site, depending on its size and how many rooms can be accessed. Larger and commercial buildings take longer. We confirm the report delivery date in your quote.
How much does a dilapidation report cost?
Ours start from $390 + GST for a typical house, signed by a structural engineer. The fixed price depends on size, the number of properties, inside access and the detail your consent conditions require.
Do I need a dilapidation report for a small renovation?
Not usually, unless your consent requires one. It's worth considering when the work involves excavation near a boundary, a shared wall, demolition or heavy machinery close to a neighbour's house.
Can a dilapidation report be used in court?
It can be used as evidence of a property's condition on the inspection date. Its weight depends on how clear, complete and independent it is, which is why measured cracks, located photos and a qualified signatory matter.

// Before work starts

Get your dilapidation report booked before the first excavator arrives.

Tell us the address and when works start. You'll have a fixed quote within 1–2 business hours, and an engineer-signed report you can rely on if anything changes.

Get a fixed quote Call 07 2150 0579

Starting from $390 + GST · No obligation

Call Get a fixed quote